Defense Health Headquarters “DHHQ” Campus - Falls Church, VA
Design specification to build out 700,000 square foot Headquarters consolidation. The enterprise cabling campus solution included 4,000 Category 6 copper cables with a 6-strand OM4 fiber (classified data) to each information outlet, including thirty-two TR’s, eleven SCIF TR’s, a main data center, a secondary data center, a separate PBX room, two building entrance demarcation rooms, and a support facility outlying building.
Backbone cabling included 40,000 feet of 12-strand OM4 Air Blown fiber optic cable, 7,000 feet of 24-strand OM4 fiber optic cable, a 600-pair copper cable to each TR and 24-strand OM4 fiber optic cable to each SCIF TR. Primary and secondary data centers required pre-terminated Category 6 copper, OM4 and singlemode pre-terminated fiber optic cabling assemblies between 76 provided and installed APC cabinets. Provided and installed copper and fiber optic patch cords in each TR to customer-provided and installed equipment. Termination, testing and certification with documentation hand-back package.