NEA/NEH and FTC
National Endowment for the Arts/National Endowment for Humanities “NEA/NEH”, Washington, DC:
Design specification to build out 105,000 square foot over 3 floors at Constitution Center. The enterprise solution included 2,100 Category 6A copper cables, six TR’s, one data center, and a building entrance demarcation room. Backbone cabling included 2,000 feet of 24-strand OM4 fiber optic cable, a 25-pair copper cable to each of the 6 TR’s.
WAP’s and a complete DAS system were installed throughout the 3 floors.
The data center required pre-terminated OM4 and single mode fiber optic cabling assemblies between provided and installed APC cabinets. Provided and installed copper and fiber optic patch cords in each TR to customer-provided and installed equipment. Termination, testing, and certification with CD documentation handback package.
Federal Trade Commission “FTC”, Washington, DC:
Design specifications provided to build out 245,000 square feet over 7 floors at Constitution Center. The enterprise solution included 4,200 Category 6A copper cables, seven TR’s, one data center, and a building entrance demarcation room. Backbone cabling included 10,000
Design specification to build out 105,000 square foot over 3 floors at Constitution Center. The enterprise solution included 2,100 Category 6A copper cables, six TR’s, one data center, and a building entrance demarcation room. Backbone cabling included 2,000 feet of 24-strand OM4 fiber optic cable, a 25-pair copper cable to each of the 6 TR’s.
WAP’s and a complete DAS system were installed throughout the 3 floors.
The data center required pre-terminated OM4 and single mode fiber optic cabling assemblies between provided and installed APC cabinets. Provided and installed copper and fiber optic patch cords in each TR to customer-provided and installed equipment. Termination, testing, and certification with CD documentation handback package.
Federal Trade Commission “FTC”, Washington, DC:
Design specifications provided to build out 245,000 square feet over 7 floors at Constitution Center. The enterprise solution included 4,200 Category 6A copper cables, seven TR’s, one data center, and a building entrance demarcation room. Backbone cabling included 10,000